MAGZIPSTRIP — FACTORY WORK-INSTRUCTION WORKSHEET Version: 2026-10-19 | inquiry@magzipstrip.com Planning record: fill and validate for the selected assembly before release. IDENTITY Product / sample / drawing revision: Material lot and A/B specimen IDs: Carrier / sleeve / core and element layout: Fabric or film stack and compressed gap: Factory / responsible technician / approval date: DRAWING CONTROL - Core envelope, stitch line and permitted position variation: - Carrier/flange dimensions and presser-foot clearance: - Channel / leather recess and remaining material thickness: - Cut locations, active length and inactive end allowance: - End and intermediate retention details clear of hard elements: LINE TRIAL - Machine, needle system/size, thread, foot and guides: - Feed, tension and approved settings from the actual coupon: - Attraction to plate/foot/tooling and approved handling arrangement: - For joining: exact film/coating/adhesive, fixture and process window: - Trial specimen and observations (alignment, distortion, seam, end retention): NEEDLE / METAL DETECTION CONTROL - Buyer requirement and responsible quality approval: - Instrument, challenge pieces, orientation and demonstrated detection: - Assembly/inspection sequence and controls after each inspection: - Broken-needle reconciliation, lot holds and reinspection records: - Validated procedure reference (do not bypass required controls): SAMPLE & LOT RELEASE - Force directions, fixture, gap, speed and acceptance criteria: - Care/conditioning and containment inspection: - Actual result/report IDs; deviations and corrective action: - A/B labels, paired-unit definition, lot traceability and packaging: - Approved sample retained / final sign-off: No universal dimensions, machine recipe or certification are established here.