MAGZIPSTRIP — INTEGRATION & PILOT RELEASE CHECKLIST Version: 2026-10-19 | inquiry@magzipstrip.com [ ] Drawing identifies both A/B sides, contact face and feed direction. [ ] Selected material, section, carrier and enclosure match the approved sample. [ ] Fabric layers, compressed gap and seam allowance are specified. [ ] Stitch path is clear of hard magnetic elements. [ ] Fixture, foot, feed tension and handling have been reviewed on the actual line. [ ] Cut positions and end retention/sealing are defined for this construction. [ ] Closed and open bending behavior have been checked on the product. [ ] Detection/inspection sequence is validated with the factory and buyer. [ ] Opening action, retention and care requirements have a sample-specific plan. [ ] Magnetic surroundings and intended-user considerations have been reviewed. [ ] Paired-unit definition, winding, labels, lot traceability and packaging are agreed. [ ] Sample and drawing revision are signed off before the production release. Project / revision: Open issues: Responsible owner / target resolution: Approval record: This checklist supports process review. It does not replace a factory's controls or a finished-product assessment. Do not bypass needle-detection requirements.